Monday, 27 February 2012

The new fence (Part 3 - 16 February 2012)

So here we are again, week 3 of the fence build. 


We arrived to find that an overgrown area down the side of one of the polytunnels had been cleared to reveal a huge space that had previously been unused, apart from as a dumping ground.


The newly uncovered area - a lot of work still to be done!!

This gave everyone a boost and on continued the fence. Fence panels started going up as well as the continuing fence post erection. Right through the middle of the fence run is a water overflow which has effectively turned into a pond. One of the posts had to be put slap bang in the middle. It took some doing to seal the hole to prevent it filling with water but we managed it.





It was half term this week so a few more people came and brought their kids along. As you can imagine, the kids had fun wading through the mud on what was a very damp and drizzly day. 


So with the ground clearing, the fence building and general clearing the site preparation continues ready for the spring.

More pictures- you know what to do

@SeftonGreenGym


No comments: